Sample Report

This page exhibits an example of a 'take-off report' I would make for use in Quoting. The report provided is  for all works typically done by the Wall and Floor tiler, including Cement floor preparation and Waterproofing.

  • Utilising the drawings provided by the architect - I like to draw colour coded mark-ups on the plans so they are easier to read, locate and edit in future when it must be re-visited.

  • I find this process is always able to be adjusted and experimented with - to ensure an expedited report with best quality result.

  • If the job is smaller - with details gained by a site visit, the report will include photographs of the site and I will create my own drawings with dimensions if I find it necessary.

  • Separate to this, I would contact the tile supplier specified for prices and their terms. Plus I would contact alternative suppliers for an improved price option.

  • The location and logistics of the job is also very important.

-          If the work is interstate - there will be extra costs for working away from home, ect.

-          If the parking scarce - I will find the best solutions for Car parks or permits.

While every job comes with its unique set of logistical challenges - they all exist within a predictable range.